Steel Slag Hot Stuffy Slag Handling

Process technology The working pressure of the steel slag pressurized hot stuffing process is 0.2~0.4MPa, which is about 100~200 times higher than that of the normal pressure pool hot stuffing process. Under higher pressure conditions, the free oxidation of water vapor and steel slag is accelerated. The reaction rate of calcium shortens the hot and stuffy time from 12 hours to 3~3.5 hours. At the same time, when this technology handles steel slag, the entire process is basically carried out in a closed system. Therefore, compared with existing steel slag treatment technology, it is cleaner and more environmentally friendly. The pressurized hot stuffing process of steel slag is divided into two operations: roller crushing and pressurized stuffing. The rolling crushing operation process is mainly to complete the rapid cooling and crushing of molten steel slag. The processing time at this stage is about 15~30 minutes. After this stage of processing, the temperature of the molten steel s…

Similar

Foundry Steel Casting Slag Pot with Cover
Steel Mill Slag Handling Equipment
Medium Speed Coal Mill Hydraulic System
Double Inlet and Double Outlet Coal Mill
Mining Bag Filter Dust Collector
Circular Bridge Type Scraper Mixing Stacker Reclaimer
Automatic Rotary Vibrating Disk Feeder
High Quality Vibratory Feeder for Stone Crusher Plant
Bulk Material Handling Belt Conveyors
High Efficiency Inclined Belt Conveyor for Bulk Material
Energy Saving Lithium Ore Flotation Machine
High Energy Rod Mill Grinding Mill Machine

Shenyang North Heavy Metallurgical Engineering Technology Co., Ltd.

Shenyang North Heavy Metallurgical Engineering Technology Co., Ltd., its leading products include EP…

Copyrights © 2024 aevictoryparts.com All Rights.Reserved .