Site preparation is always delayed?   There are often problems when entering the construction site: large Drilling Rigs take half a day to transfer, and Excavator Converted Drilling Rigs cannot be transferred in narrow sites, delaying the progress of early drilling and rock breaking. Are you also anxious because the equipment cannot keep up with the pace when rushing the construction period? This Portable Down-the-Hole Excavator Rig is the "pioneer", and its "flexible and fast" character is designed for fast site preparation. It can quickly complete basic drilling, and with the efficient rock breaking of Drilling And Splitting Machines, it only takes 30 minutes to transfer, which is 3 times faster than traditional equipment. On a small construction site, 50 holes with a diameter of 50-150 mm can be completed in a single day, shortening the site preparation period by 40%. Rich application scenarios: In emergency rescue, quickly clean up the site and drill holes to fix temporary facilit…

Similar

AWZP-150 Drilling and Splitting Integrated Machine (DTH )
WGQK Excavator-modified DTH (Down-the-Hole) Drill
Precision Mining Drilling Equipment with Remote Control
high performance Drilling Machine for Geological Boreholes
Efficient Hydraulic drilling rig for Metal mine construction
Portable Air Compressor with Wheels for Mobile Use
Reliable hydraulic stone splitting machine
Durable Hydraulic Air Compressor for Mining Applications
well DTH Drill Rig for Deep Hole Applications
WG-90 Excavator-modified Hydraulic Drill
WGL-45 Excavator-modified Anchor Drill Attachment for Tunnels
CYLJ-45 Mining Crawler Diesel-Electric Drill Jumbo

Jiangsu Aneng Drilling Equipment Technology Co., Ltd.

Jiangsu Aneng Drilling Equipment Technology Co., Ltd. is located in Xuzhou, the capital of China's e…

Copyrights © 2026 aevictoryparts.com All Rights.Reserved .