Efficient Construction Waste Processing Facility with Dual Line Configuration for Green Circular Economy and Resource Recycling
Category
Equipment
Crushing
Heavy hammer crusher / Stone crusher
Screening
Multi-layer vibrating screen
Sand Making
Vertical shaft impact sand maker
Mobile Processing
Mobile crusher (crawler/tire type)
Conveying
Belt conveyor system
Project Overview
Located in Huangshi City, Hubei Province, this general solid waste resource utilization project is equipped with two dedicated processing lines: one with an annual processing capacity of 1.5 million tons for construction waste residue and waste gravel, and another with 300,000 tons for waste steel slag. The combined system operates at 200-300 TPH, converting demolition debris, concrete blocks, bricks, waste gravel, and waste steel slag into recyclable aggregates and manufactured sand that meet industry standards. As a green circular economy initiative, the facility addresses the core industr…